Last Friday (17th November) Dan and Allistair (from our Media Team) and I went on site to get some photos of the construction team who are working hard to get Catalyst ready for Summer 2018!

We timed this with a staff BBQ that was taking place for the construction team and so they were all downing tools at the same time. We managed to get a good turn out for the photo, although some people aren’t looking too pleased at having to pose instead of tucking in to a burger!

Some of the construction team for Catalyst

Whilst we were on site we took advantage of the opportunity to snap some more photos of the building and how it’s construction is progressing. Most of the photos are taken on the first and second floors where internal walls are being constructed and the ‘first fix’ is taking place. The first fix is the initial installation of data and power into the building. It is amazing to think that we are installing data and power in to part of Catalyst, whilst other parts are still being built! Lots of activity taking place in parrallel as we’re working to a tight deadline!

Thanks to Dan Hall for the awesome photography skills!

Some of the construction team for Catalyst
Some of the construction team for Catalyst
The fancy 360 camera!
First floor views
Second Floor
Second Floor
Second Floor
Second Floor
External view of the side of Catalyst (the main entrance will be at the curve on the right)
Exterior of Catalyst.
Exterior of Catalyst.
Exterior of Catalyst. The main entrance will be under the curve
Exterior of Catalyst.
360 view on second floor
360 view

Lindsay McBride

Project Manager