Data Centre Update

Here’s what the data centre looked like on the 2nd July. The air conditioning units are being fitted at the back, the false ceiling frame is being fitted and the walls are painted. Holes have been cut in the raised floor for the power and data cables but they are hidden under the floor covering. There is still a long way to go but it is starting to look like a data centre.
Data Centre July 2 2010

The following picture is either a cutting edge experiment in ultra green data centre design, or it is the new racks being delivered. 🙂
Green Data Centre